10. Our Action Plan

Following our consultation and involvement exercise, we detail in our Action Plan our priority equality outcomes and what actions we need to take to achieve these outcomes. The Action Plan also sets out when we aim to achieve them and who will take responsibility for ensuring we meet them.

Relevance to Equality Strands

We have highlighted the strands whereby we feel that the outcome has most relevance. For example, making our buildings more accessible would largely be relevant to disabled people.

Target Dates

Where we have stated Year 1 for example, we mean by year-end of the period November 2008 to November 2009 and so on, for the following years.

Year 1: 2008-09

Year 2: 2009-10

Year 3: 2010-11

Reporting on Progress

Our Annual Equality Report will update on our progress in achieving our equality outcomes each year. Actions are likely to evolve as new priorities are identified over the life of this Equality Scheme and these will be reflected in the Annual Equality Report.

Strands: age, disability, gender/gender identity, race, religion/belief and sexual orientation

Action Plan - Corporate Planning and Management

A1

Required Outcome/Objective: An effective Equality Scheme in place that is monitored and progress on achieving our equality objectives is reported on a regularly

Action Required to Achieve Outcome/Objective: Bi-annual updates signed-off by service heads and directors; produce Annual Equality Report

Target Date(s): Year 1 and ongoing

Lead: Equality and Access Team

Measuring Success: Feedback from contacts and outcomes from Equality of Opportunity Committee

Applicable to the following strands: All strands

A2

Required Outcome/Objective: A Scheme and Action Plan that is reviewed externally every three years

Action Required to Achieve Outcome/Objective: Identify mechanism for external review

Target Date(s): Year 3

Lead: Equality and Access Team

Measuring Success: Report from external reviewer

Applicable to the following strands: All strands

A3

Required Outcome/Objective: Equality objectives are taken into account in service areas’ work planning processes

Action Required to Achieve Outcome/Objective: Build equality objectives into service areas’ plans

Target Date(s): Year 1 and ongoing

Lead: Equality and Access Team

Measuring Success: Objectives and actions are achieved and regularly reported on

Applicable to the following strands: All strands

A4

Required Outcome/Objective: New and proposed policies are equality impact assessed and staff are trained to carry out this process

Action Required to Achieve Outcome/Objective: Enhance existing impact assessment tool; work with Human Resources team to develop training for the tool

Target Date(s): Year 1; Year 1 and ongoing

Lead: Equality and Access Team

Measuring Success: Effective, inclusive policies that take into account diverse needs

Applicable to the following strands: All strands

A5

Required Outcome/Objective: Effective internal working relationships/networks in place to inform our work on equality

Action Required to Achieve Outcome/Objective: Equality Steering Group to provide an initial steer for equality development work; Involve staff networks and TUS in impact assessment and policy development process

Target Date(s): Year 1 and ongoing

Lead: Equality and Access Team

Measuring Success: Networks contributions inform impact assessment process and are included in policy decisions  

Applicable to the following strands: All strands

A6

Required Outcome/Objective: Effective external working relationships/networks in place to inform our work on equality

Action Required to Achieve Outcome/Objective: Use Disabled Users’ Network to inform policy; Use contacts from Mentoring Scheme to develop further networks

Target Date(s): Year 1 and ongoing; Year 2 and ongoing

Lead: Equality and Access Team

Measuring Success: We ensure that we come into contact with individuals and organisations who have not traditionally participated

Applicable to the following strands: All strands

A7

Required Outcome/Objective: Staff and Assembly Members are able to gain timely and accurate advice on equality, access and human rights issues

Action Required to Achieve Outcome/Objective: Equality and Access Team is visible at all times;Develop intranet resource for staff and Assembly Members

Target Date(s): Year 1 and ongoing; Year 1/2

Lead: Equality and Access Team

Measuring Success: Feedback from Assembly Commission, Assembly Members and AMSS

Applicable to the following strands: All strands

A8

Required Outcome/Objective: Awareness amongst staff and Assembly Members re equality, access and human rights is heightened

Action Required to Achieve Outcome/Objective: Hold awareness-raising events, publish articles in staff magazine, e-mails, literature, posters etc Use equality events calendar to plan awareness-raising; Members as employers in their own right are aware of their equality and access responsibilities

Target Date(s): Year 1 and ongoing; year 1

Lead: Equality and Access Team

Measuring Success: Assembly Members’ support staff have their access needs met; constituency offices are accessible

Applicable to the following strands: All strands

A9

Required Outcome/Objective: Increased engagement with members of under-represented communities, with the aim of promoting and widening engagement with and participation in democracy

Action Required to Achieve Outcome/Objective: Implementation of a multi-strand Assembly and Local Government Mentoring Scheme, administered by the Equality and Access Team; increased outreach work

Target Date(s): Year 1

Lead: Equality and Access Team; Equality and Access Team/ External Communication

Measuring Success: Participants of the Scheme become candidates at local, general and European elections and/or engage in civic participation

Applicable to the following strands: All strands

Action Plan - Human Resources

B1

Required Outcome/Objective: Our vacancies reach those local groups who represent ethnic minority people and attract the volume of applications from these groups that reflect the general population with a view to extending this incrementally to the other equality strands
Action Required to Achieve Outcome/Objective: Identify opportunities to widen recruitment  advertising; engage in outreach activities to promote our organisation as potential employer; explore the feasibility of utilising the Jobcentre Plus - 'Access to Work’ Scheme

Target Date(s): Year 1 and ongoing

Lead: HR Recruitment Team

Measuring Success: Monitor applications for employment and look for increase in the number of applications from ethnic minority people in relation to successful applications

Applicable to the following strands: Age; Race

B2

Required Outcome/Objective: Staff, Assembly Members and Assembly Members’ staff to have an increased awareness of their equality/human rights responsibilities and the following equality strands: age, disability, gender/gender identity, race, religion/belief and sexual orientation. Also, to have an understanding of the implications of the Equality Scheme and public sector equality duties

Action Required to Achieve Outcome/Objective: Develop comprehensive equality and human rights training programme for staff and Assembly Members to include core training, bespoke service area training and training aimed at Assembly Members  

Target Date(s): Year 1

Lead: HR Learning and Development Team

Measuring Success: Staff and Assembly Members have an increased awareness of equality issues

Applicable to the following strands: All strands

B3

Required Outcome/Objective: Both bullying and harassment are taken seriously and staff are educated about their duties and responsibilities

Action Required to Achieve Outcome/Objective: Enhance Dignity at Work Policy in conjunction with the TUS; ensure all staff are trained regularly on the Dignity at Work Policy; increase the number of harassment officers and investigative officers; and identify mechanism to increase the number of external investigative officers

Target Date(s): Year 1; Year 1 and ongoing; and Year 1/2

Lead: HR Operations

Measuring Success:

Applicable to the following strands: All strands

B4

Required Outcome/Objective: Grades are monitored and any gender differentials are addressed

Action Required to Achieve Outcome/Objective: Explore potential reasons for differentials and consider whether to undertake different approaches to recruitment advertising

Target Date(s): Year 1 and ongoing

Lead: HR Operations

Measuring Success:

Applicable to the following strands: Gender

B5

Required Outcome/Objective: Employment policies that take account of changing legislative requirements on equality and human rights
Action Required to Achieve Outcome/Objective: Policies to be reviewed and updated in line with changing legislation

Target Date(s): Year 1 and ongoing

Lead: HR Policies Team

Measuring Success:

Applicable to the following strands: All strands

B6

Required Outcome/Objective: Equality considerations are built into recruitment processes (including flexible working, job-share and home working arrangements)

Action Required to Achieve Outcome/Objective: Job adverts state flexible working arrangements where appropriate to business needs

Target Date(s): Year 1 and ongoing

Lead: HR Recruitment Team

Measuring Success: Staff are able to enjoy work-life balance whilst meeting business needs

Applicable to the following strands: All strands

B7

Required Outcome/Objective: Improved staff equality data is available. Data is collected, logged and easily available from monitoring employment policies

Action Required to Achieve Outcome/Objective: Assess feasibility of using Snowdrop IT system to collect staff equality data on disability, sexual orientation and religion/belief; undertake next staff equality survey

Target Date(s): Year 1; and Year 3

Lead: HR Operations

Measuring Success: Trends could be identified from data

Applicable to the following strands: All strands

B8

Required Outcome/Objective: Our emerging pay strategy has embedded within it the principle of equality

Action Required to Achieve Outcome/Objective: Undertake equal pay review and identify/address any pay gaps

Target Date(s): Year 1/ 2

Lead: HR Operations

Measuring Success: Any pay gaps identified are closed

Applicable to the following strands: Gender

B9

Required Outcome/Objective: Employees from under-represented groups feel supported and contribute to the development of policies that might affect them (staff networks)
Action Required to Achieve Outcome/Objective: Ensure that networks are supported with budget and administration and have the opportunity to contribute to policy development

Target Date(s): Year 1 and ongoing

Lead: HR Operations and Equality and Access Team

Measuring Success:

Applicable to the following strands: Disability, Race and Sexual Orientation

B10

Required Outcome/Objective: Our revised induction arrangements place appropriate emphasis on our equality commitments/duties and these arrangements are shared with Assembly Members’ staff as appropriate

Action Required to Achieve Outcome/Objective: Deliver induction training to all new staff and AMSS which incorporates a revised equality section

Target Date(s): Year 1 and ongoing

Lead: HR Learning and Development

Measuring Success:

Applicable to the following strands: All strands

B11

Required Outcome/Objective: A pilot scheme promoting work assignments for ethnic minority people to be introduced and rolled out to other strands pending review of pilot
Action Required to Achieve Outcome/Objective: Scope pilot, roll-out and review

Target Date(s): Year 1/2

Lead: HR Policies

Measuring Success:

Applicable to the following strands: Race

Action Plan - External Communications

C1

Required Outcome/Objective: Information about the Assembly and its work is accessible to all people. Awareness is raised across all sectors of society about the work of the Assembly

Action Required to Achieve Outcome/Objective: Develop Education and Outreach Strategy which takes account of all equality strands; develop media/new media strategies which take account of accessibility of information to different groups

Target Date(s): Year 1

Lead: Education and Outreach Teams; Media, Website and Publications Team

Measuring Success: Senedd/Event and exit surveys embedded into the teams’ programmes

Applicable to the following strands: All strands

C2

Required Outcome/Objective: Assembly publications with images are representative of diverse society in Wales

Action Required to Achieve Outcome/Objective: Develop Image Bank; and develop an approach to accessible communication/information

Target Date(s): Year 1/2; and Year 2

Lead: Media, Website and Publications Team

Measuring Success: Feedback forms included in publications; enter publications to national awards to encourage recognition

Applicable to the following strands: All strands

C3

Required Outcome/Objective: Press/media releases are sent to organisations that include representative organisations/groups that might represent the equality interests

Action Required to Achieve Outcome/Objective: Develop central database of contacts for use across the organisation

Target Date(s): Year 2

Lead: Public Relations Team

Measuring Success:

Applicable to the following strands: All strands

C4

Required Outcome/Objective: People from under-represented groups access and visit the Senedd and our other buildings
Action Required to Achieve Outcome/Objective: Target individuals and/or representative organisations from under-represented groups with information about the Assembly and the Senedd; ensure visitors are given feedback forms which allow us to monitor what groups our visitors are from and whether we meet their needs and requirements

Target Date(s): ongoing

Lead: Public Relations Team; and Visitor Service Team

Measuring Success: Feedback (forms and electronic) show increased number of visitors from across the equality groups accessing our buildings; and equality issues to be included in visitor profiles

Applicable to the following strands: All strands

C5

Required Outcome/Objective: Guided tours of the Senedd which are accessible to visitors with sensory impairments

Action Required to Achieve Outcome/Objective: Investigate the possibilities for installing a tactile map of Senedd; explore feasibility of tours delivered in BSL; and review accessibility of tour literature

Target Date(s): Year 1; Year 2; and Year 2

Lead: Visitor Service Team

Measuring Success: Visitors’ experiences are positive (from feedback) and interpretation materials are accessible to all

Applicable to the following strands: Disability

C6

Required Outcome/Objective: An increase in ethnic minority and disabled young people’s participation from groups in the education centre of the Assembly

Action Required to Achieve Outcome/Objective: Target relevant schools and organisations to attend and contribute to events in our Education Centre; use contacts from Assembly and Local Government Mentoring Scheme to reach under-represented groups

Target Date(s): Year 1 and ongoing

Lead: Education Service

Measuring Success: Develop network of relevant associations with clear objectives and desired outcomes; and use feedback from International Day of Disabled People celebration (December 2008) and other events aimed at interest groups

Applicable to the following strands: Age; Disability and Race

C7

Required Outcome/Objective: Widened access to under-represented groups at Assembly events over Wales

Action Required to Achieve Outcome/Objective: Ensure marketing arrangements are suitable for different audiences and local/national groups are invited

Target Date(s): Year 1 and ongoing

Lead: Events and Marketing Team

Measuring Success: Audience survey to inform delivery strategy; feedback forms form summer and other events enable us to see where we could improve if needed; and cross-reference exit survey and visitor profiles with marketing strategy

Applicable to the following strands: All strands

C8

Required Outcome/Objective: People from under-represented groups view and/or engage in Assembly proceedings (e.g. committees, plenary and the petitions system)

Action Required to Achieve Outcome/Objective: Raise awareness and promote engagement using website and other appropriate media. Produce information targeted at different audiences (using languages other than English and Welsh and alternative formats)

Target Date(s): Year 2 and ongoing

Lead: Public Relations /Media, Website and Publications Teams

Measuring Success: Cross-reference marketing strategy objectives with Business Directorate evidence gathering and participative events programme

Applicable to the following strands: All strands

C9

Required Outcome/Objective: Frontline staff that are trained and feel confident in welcoming people with differing needs to the Assembly
Action Required to Achieve Outcome/Objective: Arrange appropriate training for frontline staff and refresher training thereafter

Target Date(s): Year 1 and ongoing

Lead: Visitor Services and Equality and Access Team

Measuring Success: Multi-skilled team, awareness of relevant issues and ownership of access and equality issues informing Communication service plan and activity

Applicable to the following strands: All strands

Action Plan - ICT

D1

Required Outcome/Objective: An accessible website that all people, including disabled people, can access easily
Action Required to Achieve Outcome/Objective: Act on customer suggestions and feedback where appropriate

Target Date(s): Year 1 and ongoing

Lead: ICT

Measuring Success: Web-user feedback and compliance with AA web standards

Applicable to the following strands: Disability

D2

Required Outcome/Objective: IT equipment is accessible and made available for staff with specific requirements in a timely manner

Action Required to Achieve Outcome/Objective: Identify requirements at earliest stage i.e. recruitment or when needs are identified (for existing employees)

Target Date(s): Year 1 and ongoing

Lead: ICT

Measuring Success: Feedback from staff

Applicable to the following strands: Disability

D3

Required Outcome/Objective: Development of new features for the website to enable full and equal public engagement

Action Required to Achieve Outcome/Objective: Identify needs of customer (using feedback from our networks) and identify suitable adjustments

Target Date(s): Year 1/2

Lead: ICT

Measuring Success: Feedback reflects comments made by our networks and contacts. Our website is regarded as an exemplar in terms of accessibility

Applicable to the following strands: All strands

Action Plan - Procurement/Supply Management

E1

Required Outcome/Objective: Our suppliers operate to the highest standard in relation to equality issues; the supply chain is given a clear indication that equality is important to us as an organisation and that suppliers would be expected to act accordingly

Action Required to Achieve Outcome/Objective: Explore how we could monitor contracts in terms of equality considerations and assess resource requirement needed to undertake this

Target Date(s): Year 2/3

Lead: Procurement Manager

Measuring Success: Contract managers feel confident that they are building equality considerations into contract award and maintenance

Applicable to the following strands: All strands

Action Plan - Estates and Facilities Management

F1

Required Outcome/Objective: Buildings that are safe, accessible, clean environments for staff, contracted staff, Assembly Members, their staff and visitors

Action Required to Achieve Outcome/Objective: Regular maintenance, cleaning and health and safety assessments undertaken;

Act on access audit and feedback information to undertake adjustments to our buildings where required (to include Tŷ Hywel, Colwyn Bay Office, the Senedd and Pierhead Building)

Target Date(s): Year 1 and ongoing

Lead: Estates and Facilities Management Team

Measuring Success: Customer feedback and results of future assessments and audits

Applicable to the following strands: All strands

F2

Required Outcome/Objective: Work spaces for staff, Assembly Members, their staff and other contracted staff that are ergonomic and accessible

Action Required to Achieve Outcome/Objective: Regular DSE and workplace assessments undertaken

Target Date(s): Year 1 and ongoing

Lead: Health and Safety Team/Estates and Facilities Management Team

Measuring Success: Measure number of DSE/risk assessments undertaken against action required

Applicable to the following strands: Disability

F3

Required Outcome/Objective: Health and Safety Risk Assessments that take account of equality and access considerations

Action Required to Achieve Outcome/Objective: Health and Safety Team to work with Access Officer where necessary during H&S risk assessments

Target Date(s): Year 1 and ongoing

Lead: Health and Safety Team/Estates and Facilities Management Team

Measuring Success: Actions resulting from risk assessments are acted on immediately

Applicable to the following strands: Disability

Action Plan - Security Team

G1

Required Outcome/Objective: Security team staff that are professional, trained and feel confident to deal with a diverse range of visitors with differing needs

Action Required to Achieve Outcome/Objective: Staff to attend bespoke courses to meet needs and attend refresher training thereafter

Target Date(s): Year 1 and ongoing

Lead: Security Team

Measuring Success: Staff that feel confident to deal with a diverse range of people and take ownership of equality and access issues

Applicable to the following strands: All strands

Action Plan - Assembly Business

H1

Required Outcome/Objective: Members are provided with opportunities to build in equality considerations to their work in the Assembly and in their constituencies

Action Required to Achieve Outcome/Objective: Identify opportunities to build equality considerations into briefing for Assembly Members and committees; identify bespoke equality training for staff according to business/Assembly Members’ needs

Target Date(s): Year 1 and ongoing

Lead: Members’ Research Service

Measuring Success: Increased reference to equality considerations in briefing provided. Assembly Members requesting and using the information MRS provides. Also, Members’ feedback on MRS briefings via the Customer Liaison Group

Applicable to the following strands: All strands

H2

Required Outcome/Objective: Research outputs published on the National Assembly for Wales’s web pages are as accessible as possible

Action Required to Achieve Outcome/Objective: Outputs are published in the most accessible format possible, with options available for alternative formats if required

Target Date(s): Year 1 and ongoing

Lead: Members’ Research Service and ICT

Measuring Success: Compliance with Web AA standards; Web-user feedback, including Disabled Critical Friends’ feedback

Applicable to the following strands: Disability; Race

H3

Required Outcome/Objective: Under-represented groups are consulted accordingly when scrutiny and legislative committees are calling for evidence

Action Required to Achieve Outcome/Objective: Use centralised database of contacts - see External Communications; Advice from Equality and Access Team when required

Target Date(s): Year 2; Year 1 and ongoing

Lead: Members’ Research Service, Committee Service and Legislation Office

Measuring Success: After identification of witnesses and consultees, under-represented groups’ views are heard

Applicable to the following strands: All strands

H4

Required Outcome/Objective: Records of plenary and committee meetings are fully accessible to staff, Assembly Members, and members of the public via the Assembly's website and fully compliant with AA standards

Action Required to Achieve Outcome/Objective: Publish on time and respond to requests for alternative formats where appropriate

Target Date(s): Year 1 and ongoing

Lead: Parliamentary Translation and Reporting and ICT

Measuring Success: Compliance with Web AA standards; Customer feedback

Applicable to the following strands: Disability; Race

H5

Required Outcome/Objective: Interpretation equipment is accessible to all staff, Assembly Members, committee witnesses, visitors and members of the public

Action Required to Achieve Outcome/Objective: Notification of requirements to PTRS Business Unit to ensure that equipment is available

Target Date(s): Year 1 and ongoing

Lead: Parliamentary Translation and Reporting and ICT

Measuring Success: Customer feedback

Applicable to the following strands: All strands

Action Plan - Legal Service Team

I1

Required Outcome/Objective: A member of the service specialises in equality issues and is responsible not only for giving specialist advice on such issues but also for disseminating information on such issues amongst other lawyers

Action Required to Achieve Outcome/Objective: Identify lawyer to specialise equality issues; lawyers to disseminate information on equality issues to rest of team accordingly

Target Date(s): Year 1; Year 1 and ongoing

Lead: Legal Service Team

Measuring Success: Assembly Members and staff have heightened awareness and knowledge of equality issues

Applicable to the following strands: All strands

I2

Required Outcome/Objective: All lawyers receive, before the end of the period of the Scheme, appropriate training focussed on legal equality issues

Action Required to Achieve Outcome/Objective: Identify requirements for training and undertake training

Target Date(s): Year 3

Lead: Legal Service Team

Measuring Success: Lawyers have effective knowledge of equality legislation

Applicable to the following strands: All strands

I3

Required Outcome/Objective: Lawyers prepare regular reports to the Equality and Access Team on the current status of the Assembly and of the Commission within the framework of international, EC, UK and Welsh equality legislation

Action Required to Achieve Outcome/Objective: Lawyers to prepare reports as necessary and liaise with Equality and Access Team

Target Date(s): Year 1 and ongoing

Lead: Legal Service Team

Measuring Success: The Equality and Access Team is able to anticipate legislative change at the earliest opportunity

Applicable to the following strands: All strands